Data Center Project Cancelled in North Dakota? We Buy the Equipment.
Power timelines slip. Financing falls through. Mining economics change overnight. When a data center project in North Dakota gets cancelled, stalled, or downsized, somebody is left holding crated, never-installed equipment — and every month it sits, it costs storage, ties up capital, and loses value. Surplus Buyers & Demo is the solution: one buyer, one cash number for the whole package, and a crew that loads it out.
We buy across data center and crypto mining projects around Fargo and Bismarck — and everywhere else in North Dakota a project has been left holding equipment it no longer needs.
The Problem With a Cancelled Project
Brokers want to list your equipment and wait. Auctioneers take a percentage and months to sell it piece by piece. Scrap yards price brand-new cooling towers and switchgear by the pound. Meanwhile the yard rent, the storage, and the capital sitting in crates are all on you.
The Solution: One Buyer, One Number, Loaded Out
We buy the whole package outright — priced as equipment, not scrap — pay on the spot, and handle rigging, loading, and hauling. Working equipment goes back into service at operating facilities. That is not a pitch; it is what we did in Little Rock, Arkansas, and the field footage is below.
Field Work: The Little Rock Load-Out
This is what the solution looks like in the field. When a cryptocurrency-mining data center near Little Rock, Arkansas was cancelled, its cooling towers sat crated and never installed. We bought the cancelled project outright — the whole package — for cash, loaded out the towers, and they are headed to another data center — back to work instead of to the shredder. Watch our co-owner Angelo Peres on site:
“We come out to the city near you. We pay cash on the spot, wire transfer, or check. Any dead equipment you’re trying to get rid of — let us know.” — Angelo Peres, co-owner, on site in Little Rock
What We Buy in North Dakota
- Cooling towers, dry coolers, and fluid coolers — crated or installed
- Chillers, CRAH/CRAC units, and air handlers
- Generators and backup power systems
- Switchgear, breakers, transformers, and busway
- UPS systems and battery strings
- Crypto mining infrastructure — containers, PDUs, transformers, cooling
- Racking, containment, and leftover project materials
How It Works
1. Tell us what you have. Photos and a list are enough to start — call, text, or use the quote form.
2. Get one cash number. One offer for the whole package, priced as equipment — not by the pound.
3. Get paid on the spot. Cash, wire transfer, or check at pickup.
4. We load it out. Rigging, loading, and hauling handled by us. Site left clean, on your schedule.
Questions From North Dakota Sellers
My data center project in North Dakota was cancelled. Who buys the equipment?
We do — cooling towers, dry coolers, chillers, generators, switchgear, transformers, UPS systems, and mining infrastructure, for one cash number with load-out handled.
Do you buy equipment that is still crated and never installed?
Yes — that is the best case. Crated equipment is priced as equipment, and much of it goes back into service at operating facilities.
How fast can you close and load out?
On your schedule. Payment is made on the spot at pickup — cash, wire transfer, or check — and our crew handles the rest.
Why not auction it instead?
Auctions take months and charge commissions and seller fees. A direct purchase settles the whole package at once, at a number you agree to before anything moves.
Send photos of what you have for a fast cash offer.
Office: (346) 526-1405 · Toll-free: 1 (877) 722-6048
Tell Us What You Have →